Construction of Hardstanding Platform of 8400 SQM , Civil Work for Prefab Shed and Toilet Block

Construction of Hardstanding Platform of 8400 SQM , Civil Work for Prefab Shed and Toilet Block

  • Project - Construction of Hardstanding Platform of 8400 SQM , Civil Work for Prefab Shed and Toilet Block
  • Client - M/s India Exposition Mart Ltd
  • Architect - M/s MCCF
  • PMC - M/s Karrdias Techno Service Pvt Ltd
  • Nature of Work - Hardstanding –Includes dismantling of existing building structure, civil work, G.S.B., W.B.M., Bitumen macadam, interlocking paver flooring , grass paver flooring rcc drain with cover, M S grating, and Fire fighting works Toilet Block: Civil Work, Finishing Work, Plumbing Work , Electrical Works and other allied works.
  • Project Cost - 590 Lacs
  • Completion period - 06 Months